elizilla: (Default)
[personal profile] elizilla
They have peeled up about half of the square they outlined with their saws, the other day, and they're now filling it in with asphalt. The square is about 10 feet by 15 feet. This apparently requires a dozen large trucks and about 20 guys. Hopefully the large number of trucks and guys means it will be smoother than the two-guy-one-truck patches where they just shovel in some cold patch and let the cars squish it down.

I didn't see anyone do anything under the street there. They didn't dig a hole. The square they pulled up did have a smaller patch in it, but it wasn't a pothole. I'm still baffled.

Date: 2012-09-22 07:10 am (UTC)
From: [identity profile] bigblued.livejournal.com
Maybe they were installing a traffic sensor? Not the kind that controls the traffic lights. The kind that lets you look at Google maps and see how bad the traffic is.

Profile

elizilla: (Default)
elizilla

February 2026

S M T W T F S
12345 67
891011 121314
15161718192021
22232425262728

Style Credit

Expand Cut Tags

No cut tags
Page generated Feb. 14th, 2026 08:15 pm
Powered by Dreamwidth Studios